EASTER SHUTDOWN WORKS

The Easter shutdown period has again been extremely busy for IRL Group Limited. We successfully completed works for Clients where the need for continuous production is a must and windows for production to cease are limited to shutdown periods. Our Clients come to us because they know they can rely on us being prompt and efficient causing minimal disruption to their working patterns.

Clear, Concise and Effective - The floor markings range from IRL Group Ltd will ensure that inside or outside demarcations will always be seen, keeping pedestrians safe. DO YOU HAVE AN AREA IN MIND FOR THE MAY BANK HOLIDAY SHUTDOWNS?

Demarcation Lines

Please contact us to discuss any areas you have that may require attention during the May Bank Holidays, areas may include:

  • Fire Exits
  • Hatchings
  • Zebra Crossings
  • Pedestrian Logos
  • Speed Circles
  • Directional Arrows
  • Signage (Numbers and Letters)
  • Walkway Linings

These areas are created with varying degrees of slip-resistance finishes (if required) and in accordance with H&S requirements.

WOULD YOU BENEFIT FROM THIS TYPE OF SAFETY FLOORING?

If you feel that your Workplace and Employees would work more safely and benefit from this type of demarcation please do not hesitate to contact us for a site visit.

01
Back to news