INVESTORS
IN PEOPLE
IRL
are pleased to announce that their Investors In People recognition has
again met the required standards for successful accreditation. Investors
In People is a flexible and easy to use standard which helps
organisations transform their business performance. Their frameworks are
outcome focused, outlining what you need to achieve, but never
prescribing how. This flexible approach allows thousands of different
employers of every sector and size to use the same framework.
Stewart Jones -
Managing Director of IRL says "Happy staff strive for excellence and are
eager to learn and develop. They are more efficient, more productive
and deliver better results".
With training in mind
and a most important factor IRL continue to confirm their commitment to
training by enroling five apprentices to the FeRFA
Apprentice Scheme. FeRFA the resin flooring association represents
the leading manufacturers, contractors and associated companies
involved in resin flooring.
The trainee will gain
experience, through off the job training sessions of every aspect of the
industry, but the scheme provides flexibility through the on the job
training elements to suit the employer's core business requirements,
whilst delivering the NVQ level 2 outcome after a 2 year training
period. The contents of this course are designed to ensure that the
operator is able to understand the hazards and the safe working
practices within this specialised trade and, upon completion of
training, the Apprentice will be able to operate equipment and lay resin
floors to industry standards of competence.
See below recent case
study showing how the IRL skilled and qualified workforce sucessfully do
what they do best.
ALBERT
BROWNE LTD
When
Albert Browne Ltd in Leicester required their warehouse floor to be
refurbished, IRL were pleased to be awarded the Contract.
The 860 square metre
concrete floor was prepared by vacuum shot blasting and lightly
abrading, Sikafloor 264 High Build Epoxy Resin was applied followed by
Line Marking in contrasting colours to designated walkways. All works
were completed within the scheduled time scale and finished to a very
high standard.
Other case studies
|